With the passing months, exam preparation for govt. exams viz. SSC CGL, SSC CHSL, SSC CPO, SSC JE, SSC MTS and other prominent competitive exams is required to ace your performance in these sought after govt job. based exams. And to make you provide with an extraordinary experience of learning via the best study content of ADDA247 Publication Books, we will be providing daily quizzes of all the four mandatory subjects let it be Quantitative Aptitude, English Language, Reasoning and General Awareness right away from ADDA247 Publication Best Books For all SSC Exams to facilitate you with our Publication Books' efficiency encompassed with comprehensive study material subsumed with holistic notes, Practice Sets and Exercises.
Starting from today, the quizzes on SSCADDA for all SSC Exams will be based on ADDA247 Publication Books to make you experience a beneficial journey which drums up your efforts, preparation strategy and time managing skills. Quantitative aptitude holds its own importance in all SSC Exams and quantitative aptitude is its one significant part, considering the same, Arithmetic Quiz is all set to catalyze your preparation.
>/center>
Q1. A can complete a job in 9 days, B in 10 days and C in 15 days. B and C start the work and are forced to leave after 2 days. The number of days taken by A to finish the remaining work is:
A एक कार्य को 9 दिनों में, B 10 दिनों में और C 15 दिनों में पूरा कर सकता है. B और C एक साथ कार्य शुरू करते हैं और 2 दिन के बाद वह कार्य छोड़ देते हैं. शेष कार्य को पूरा करने के लिए A द्वारा लिए गये दिनों की संख्या कितनी है:
(a) 8
(b) 9
(c) 6
(d) 14
Q2. A and B together can do a job in 2 days; B and C can do it in 4 days; and A and C in 2(2/5) days. The number of days required for A to do the job alone is:
A और B एक साथ एक कार्य को 2 दिनों में कर सकते हैं; B और C इस कार्य को 4 दिनों में कर सकते हैं; और A और C इसे 2(2/5) दिनों में पूरा कर सकते है. अकेले कार्य करते हुए A इस कार्य को कितने समय में पूरा करेगा?
(a) 1
(b) 3
(c) 6
(d) 12
Q3. A and B separately do a piece of work in 20 and 15 days, respectively. They worked together for 6 days, after which B was replaced by C. If the work was finished in the next 4 days, then the number of days in which C alone could do the work will be:
A और B एक कार्य को क्रमश: 20 और 15 दिनों में पूरा कर सकते हैं. वह 6 दिनों तक एक साथ कार्य करते है, जिसके बाद B को C द्वारा प्रतिस्थापित किया जाता है. यदि कार्य अगले 4 दिनों में समाप्त हो जाता है, तो C अकेले कार्य करते हुए कार्य को कितने समय में पूरा कर सकता है.
(a) 60 days/दिन
(b) 40 days/दिन
(c) 35 days/दिन
(d) 30 days/दिन
Q4. B can do a piece of work in 6 h, B and C together can do it in 4 h, and A, B and C together in 2(2/3) h. In how many hours can A and B together do the same piece of work?
B एक कार्य को 6 घंटे में कर सकता है, B और C इस कार्य को 4 घंटे में पूरा कर सकते है, और A,B और C इसे 2(2/3) घंटे में पूरा कर सकता है. A और B एक साथ कार्य करते हुए समान कार्य को कितने समय में पूरा करेंगे?
(a) 11 h/घंटे
(b) 6(1/7) h/घंटे
(c) 2(3/7) h/घंटे
(d) 3(3/7) h/घंटे
Q5. X can do 1/4 of a work in 10 days. Y can do 40% of the work in 40 days and Z can do 1/3 of the work in 13 days. Who will complete the work first?
X एक कार्य का 1/4 भाग 10 दिनों में पूरा कर सकता हैं. Y 40 दिनों में 40% कार्य कर सकता है और Z 13 दिनों में कार्य का 1/3 भाग पूरा कर सकता है. पहले कार्य कौन पूरा करेगा?
(a) X
(b) Y
(c) Z
(d) Both X and Z/X और Z दोनों
Q6. A contractor undertakes to built a walls in 50 days. He employs 50 people for the same. However after 25 days he finds that only 40% of the work is complete. How many more man need to be employed to complete the work in time?
एक ठेकेदार 50 दिनों में दीवारों का निर्माण करने का कार्य लेते है. वह इसके लिए 50 व्यक्तियों को कार्यरत करते है. हालांकि 25 दिनों के बाद उन्हें ज्ञात होता है कि केवल 40% कार्य पूरा हुआ है. समय पर कार्य पूरा करने के लिए कितने और व्यक्ति को कार्यरत करने की आवश्यकता है?
(a) 25
(b) 30
(c) 35
(d) 20
Q7. A certain number of people were supposed to complete a work in 24 days. The work, however, took 32 days, since 9 people were absent throughout. How many people were supposed to be working originally?
एक कार्य को 24 दिनों में निश्चित व्यक्तियों द्वारा पूरा किया जाना था. हालांकि, 9 व्यक्तियों की अनुपस्थिति के कारण कार्य में 32 दिन का समय लगा. मूल रूप से कितने लोग कार्यरत थे?
(a) 32
(b) 27
(c) 36
(d) 30
Q8. A and B completed a work together in 5 days. Had A worked at twice the speed and B at half the speed, it would have taken them 4 days to complete the job. How much time would it take for A alone to do the work?
A और B एक साथ कार्य करते हुए एक कार्य को 5 दिनों में पूरा करते है. यदि A दोगुनी गति और B आधी गति से कार्य करते है, तो उन्हें कार्य पूरा करने में 4 दिन का समय लगता है. अकेले कार्य करते हुए A को कार्य पूरा करने में कितना समय लगेगा?
(a) 10 days/ दिन
(b) 20 days/ दिन
(c) 15 days/ दिन
(d) 25 days/ दिन
Q9. If 15 men or 24 women or 36 boys can do a piece of work in 12 days, working 8 hrs per day, how many men must be associated with 12 women and 6 boys to do another piece of work 2(1/4) times as large in 30 days working 6 hrs per day?
यदि 15 पुरुष या 24 महिलाएं या 36 लड़के एक कार्य को प्रतिदिन 8 घंटे कार्य करते हुए 12 दिनों में पूरा कर सकते हैं,तो 12 महिलाएं और 6 लड़कों के साथ कितने पुरुषों को कार्यरत करना चाहिए ताकि 2(1/4) गुने कार्य को 6 घंटे प्रतिदिन कार्य करते हुए 30 दिनों में पूरा किया जा सके?
(a) 6
(b) 4
(c) 8
(d) 10
Q10. Efficiency of Asha is 25% more than Usha and Usha takes 25 days to complete a piece of work. Asha started the work alone and then Usha joined her 5 days before completion of the work. For how many days Asha worked alone?
आशा की क्षमता उषा से 25% अधिक है और उषा एक कार्य को पूरा करने में 25 दिन का समय लेती हैं. आशा अकेले कार्य शुरू करती है और फिर कार्य पूरा होने से 5 दिन पहले उषा के साथ जुड़ जाती है. आशा ने कितने दिन अकेले कार्य किया ?
(a) 13 days/दिन
(b) 11 days/दिन
(c) 10 days/दिन
(d) 15 days/दिन
Q11. A, B and C can do a work in 8, 16 and 24 days respectively. They all begin together. A continues to work till it is finished, C left after 2 days and B one day before its completion. In what time is the work finished?
A,B और C एक काम को क्रमश: 8, 16 और 24 दिनों में कर सकते हैं। वे सभी एक साथ शुरू करते हैं। जब तक यह समाप्त नहीं हो जाता तब तक काम जारी रहता है, C 2 दिनों के बाद छोड़ दिया जाता है और बी पूरा होने से एक दिन पहले। काम कब खत्म हो चुका है?
(a) 7 days
(b) 5(2/9) days
(c) 6 days
(d) 8 days
Q12. Anu can complete a work in 10 days. Manu is 25 more efficient than Anu and Sonu is 60% more efficient than Manu. Working together, how long would they take to finish the job?
अनु एक काम को 10 दिनों में पूरा कर सकता हैं। मनु अनु से 25 अधिक कुशल है और सोनू मनु से 60% अधिक कुशल है। एकसाथ काम करने पर, काम खत्म करने में कितना समय लगेगा?
(a) 2(6/17)days/ 2(6/17) दिन
(b) 5(6/7) days/ 5(6/7) दिन
(c) 3(5/8) days/ 3(5/8) दिन
(d) 4(5/8) days/ 4(5/8) दिन
Q13. A, B and C working together completed a job in 10 days. The ratio of their efficiency is 2 : 3 : 6. How many days would be required by the fastest worker to complete the entire work?
A B और C ने मिलकर एक काम को 10 दिनों में पूरा किया। उनकी दक्षता का अनुपात 2: 3: 6 है: पूरे काम को पूरा करने के लिए सबसे तेज़ कार्यकर्ता द्वारा कितने दिन की आवश्यकता होगी?
(a) 59/3days
(b) 49/3 days
(c) 65/3days
(d) 55/3 days
Q14. Ten men can finish a piece of work in 10 days, whereas it takes 12 women to finish it in 10 days. If 15 men and 6 woman undertake the work, how any days will they take to complete it?
दस पुरुष काम का एक टुकड़ा 10 दिनों में खत्म कर सकते हैं, जबकि 10 दिनों में इसे खत्म करने में 12 महिलाएं लगती हैं। यदि 15 पुरुष और 6 महिलाएं कार्य करती हैं, तो इसे पूरा करने के लिए वे कितने दिन लगेंगे?
(a) 4(1/2) days/ 4(1/2) दिन
(b) 4 days/ 4 दिन
(c) 5 days/ 5 दिन
(d) 6 days/ 6 दिन
Q15. Two men undertake to do a piece of work for Rs. 600. One alone could do it in 6 days and the other in 8 days. With the assistance of a boy, they finish it in 3 days. The boy’s share should be:
दो पुरुष 600 रुपये के लिए काम का एक टुकड़ा हाथ में लेते हैं। एक अकेले ही इसे 6 दिनों में और दूसरा 8 दिनों में कर सकता था। एक लड़के की सहायता से, वे इसे 3 दिनों में खत्म कर देते हैं। लड़का का हिस्सा होना चाहिए:
(a) Rs. 75/ 75 रु.
(b) Rs. 225/ 225 रु.
(c) Rs. 300/ 300 रु.
(d) Rs. 100/ 100 रु.
You may also like to read:
- SSC Books 2018: Best Books for SSC CGL, GD & CPO
- Check Latest Updates About SSC CGL Exams
- Check Latest Updates About RRB Group D Exams
No comments:
Post a Comment