Double Diagram Data Interpretation Set: Part 5

May 25, 2017    

Directions (1 to 5): Following Line Graph represents the uniform speed of Trains (A, B, C, D and E) on two different days in meter per second and the Bar Chart represents the length of each train in meter. 

1. Approximately what is the average time taken by train D on day 1 and day 2 to cross the platform of length 500 meter? 
C. 12 Sec 
D. Data Insufficient
E. None of these 
2. At what speed must train C travel on Day 2 such that it crosses the platform of 500 meter in half of the expected time? 
A. 139 m/s
C. 159 m/s
D. Data insufficient
E. None of these 
3. What is the average speed of all the trains on Day 1 in Km/Hr? 
D. Data insufficient
E. None of these 
4. What will be the total time travelled by train B, C & D on Day 1? 
A. 554 minutes
B. 224 minutes
C. 334 minutes
D. Data insufficient
E. None of these 
5. What is the ratio of Percentage increase or decrease in speed of Train A from day 1 to day 2 to Train D from day 1 to day 2? 
D. Data insufficient
E. None of these 

Answers: 

1. Option B 

Time= Distance/Speed 
Time taken on day 1, t1= (train length + Platform Length)/speed 
= (225+500)/200 
= 3.6 sec 
Time taken on day 2, t2= (train length + Platform Length)/speed 
= (225+500)/50 
= 14.5 sec 
Average time = (t1+t2)/2 
= 9 seconds (ans) 

2. Option A 

Expected time = (125+500)/ 70 
= 9 seconds 
Speed needed to cross the platform in 4.5 sec = (125+ 500)/4.5 
= 139 m/s (ans) 

3. Option E 

Average speed on day 1 = total speed/5 
= (60+75+105+200+170)/5 
= 122 m/s 
Average speed on day 1 in km/hr = 122*(18/5) 
= 439 km/hr (ans) 

4. Option D 

Without knowing the distance travelled time cannot be calculated, so data is not sufficient. 

5. Option C 

% increase in speed of Train A= [(150-60)/60]*100 
% decrease in speed of Train D= [(200-50)/200]*100 
Ratio = 150: 75 
= 2: 1(ans)
RBI Grade B Online Classes by Ramandeep Singh - Join here
notifications

Oliveboard Test Series(Recommended)


Bank Exams Today Notes

Join 40,000+ readers and get free notes in your email

Let's block ads! (Why?)



- http://www.bankexamstoday.com/2017/05/double-diagram-data-interpretation-set_25.html
Double Diagram Data Interpretation Set: Part 5 4.5 5 Yateendra sahu May 25, 2017 Directions (1 to 5): Following Line Graph represents the uniform speed of Trains (A, B, C, D and E) on two different days in meter per seco...


Related Post:

  • Special Drawing Rights (SDR): Key Points to Remember
    Introduction Special Drawing Rights (SDR) was created in 1969 by IMF as a fixed exchange rate system to support the Bretton Woods agreement. SDR Calculation SDR is calculated based on the basket of five international currencies The five currencies … Read More
  • Fill in the Blanks to make the Sentence Meaningful
    Directions (1-10): In each of the following sentences there are two blank spaces. Below each sentence there are five pairs denoted by numbers 1), 2), 3), 4) and 5). Find out which pair of words can be filled up in the blanks in the sentence in the… Read More
  • Current Affairs 17 December 2016
    Indian appointed to Civil Nuclear Trade Advisory Committee  A noted Indian-American expert on India-US civil nuclear deal has been re-appointed to the Civil Nuclear Trade Advisory Committee of the US Department of Commerce.  Vijay Saza… Read More
  • IDBI Banks Executive 2016 Pre-Exam Call Letter Out
    Dear Readers, IDBI Bank has published the pre-exam training call letter for the Recruitment for the post of Executive (2016-17). Link is given below: Important Dates Commencement of Call letter Download: 16 - 12 - 2016 Closure of Call letter Downl… Read More
  • Quantitative Aptitude : 200 Sure Shot Questions (PDF)
    Hi readers, From past 5 years I am analysing the questions papers of IBPS, SBI, RBI, LIC and many other competitive exams. Quantitative Aptitude is my favorite subject, because that's where you can make the difference. Right now there is fierce&nbs… Read More
Load comments

No comments:

Post a Comment